Struisbaai Slipway
Concerned members of Suidpunt got together at the harbour on 5 September 2009 to investigate and
propose a solution to improve the launch site in front of the wash bays. Numerous complaints about
the facilities in the harbour area were previously discussed with MCM personnel, but to date nothing
happened about the poor launching sites.
The decision taken was to manufacture 20 x 3.600 mm concrete, steel reinforced sleepers and
increase the slipway by 2 metres. The concrete sleepers will be joint together to prevent it from
moving. Hopefully this will make the launch and loading of boats more safe for man and
machinery.
Contact Johan van der Walt 0823759810 or Maans Conradie 0832505066 for more
information
|